New sheds, logged each quarter, before the filing.

A change layer of new large-format warehouses and yard extensions in your region, read from high-res imagery.

Spec

GSD
0.5–2 m (High)
Cadence
Quarterly
Platform
High-res satellite
Spectral
RGB
Detects
New and expanded large-format footprints
Delivery unit
One region per project
Format
GeoPackage or shapefile, plus CSV
01

The files

File

Change layer

Format
GeoPackage or shapefile
What's in it
Polygons for each new or expanded large-format footprint found since the last pass, one layer per region per quarter. Each polygon is tagged new building or yard extension. Opens in ArcGIS or QGIS next to your supply tracker's own layer.
Cadence
Each quarterly pass
File

Footprint area

Format
CSV
What's in it
One row per detected shed or extension: ID, footprint area in square feet and the quarter it first showed. Paste it into the tracker as a new tab.
Cadence
Each quarterly pass
File

Review overlays

Format
PNG
What's in it
An image for each new site with the detected outline drawn over the imagery, so you can check it by eye before it goes in the tracker.
Cadence
Each quarterly pass
File

Quarter-over-quarter record

Format
Same layer, kept
What's in it
Each pass is compared with the baseline from the one before. A yard extension shows against the building it grew from, and a site that was graded last quarter shows when the building goes up.
Cadence
Across passes
02

How it works

  1. 01In

    Set the region

    Send a boundary for the market or submarket, as a shapefile, GeoJSON or a drawn area. Tell us the footprint size you care about.

  2. 02Pass

    Quarterly pass

    We pull the high-res pass for the region and compare it with the previous baseline.

  3. 03Detect

    Detect change

    New and expanded large footprints are outlined against that baseline, and the area of each is measured.

  4. 04Out

    Delivery

    The layer, the CSV and the overlays land after each quarterly pass. The first pass sets the baseline, so the first change layer comes with the second.

03

Limits

Condition
L1

Size threshold

Effect on the output
At 0.5–2 m, a pixel is big next to a loading dock door or a single trailer. Large-format sheds and wide yard extensions are what this resolution is suited to. Small last-mile and infill units fall below what is reliably detected, and so do narrow additions to existing buildings.
Condition
L2

Footprint, not tenancy

Effect on the output
The layer shows a built footprint. It does not say who is leasing it, whether it is leased at all, or whether it was a speculative build or build-to-suit.
Condition
L3

Quarterly, not live

Effect on the output
A shed finished mid-quarter appears on the next pass. Currency is bounded by the pass, never continuous.
Condition
L4

Cloud and clear-sky window

Effect on the output
Optical imagery needs a clear view. A cloudy stretch can push a pass later or leave part of a region for the next one, and the delivery notes what was missed.
Condition
L5

Not a permit record

Effect on the output
This reads what has been built. It does not replace permit filings, and it will not match them line for line: some filings never get built, and some buildings go up before the paperwork is public.
Condition
L6

Floor area and height

Effect on the output
Footprint is ground area. The imagery gives no ceiling height, floor count or square footage of leasable space.
04

Why this exists

The supply tracker is built from permit filings, news releases and broker calls. It works for what has been announced.

A shed can be framed and walled before anything reaches those sources, and the leasing or acquisition screen gets run against a supply count with that building missing. This puts a direct read of the ground next to the paperwork, once a quarter.

Corrugated wall of a newly built warehouse behind a site fence, with graded bare ground in front
Scenery only. Photo: Jan van der Wolf / Pexels
05

Who it's for

For

  • Industrial REIT research and acquisitions analysts sizing regional big-box supply.
  • Leasing and portfolio teams screening a market before a lease or purchase.
  • Analysts who keep a quarterly supply tracker and want a check on it from imagery.

Not for

  • Teams that need tenancy, occupancy or lease status.
  • Last-mile, small-bay or infill unit tracking.
  • Live or weekly construction monitoring.
  • Cost, rent or vacancy data.
06

Questions before a project

Does this catch small last-mile units?

No. Detection targets large-format footprints. Small units fall below the useful threshold at this resolution.

Does it tell us who is leasing a building?

No. It detects the built footprint, not the tenant or the lease.

How current is a quarter?

As current as the last pass. A shed finished mid-quarter shows up on the next one.

Does it replace permit data?

No. It is an imagery-based cross-check on permits and press, not a substitute for the permit record.

Can we check it against our own tracker?

Yes. Pick a region where your tracker is current and compare the layer's new sites with your entries. The overlays let you confirm each one by eye.

What files do we get and how do they load?

A GeoPackage or shapefile plus a CSV, so it opens in ArcGIS, QGIS or a spreadsheet. We do not write into your database directly.

Who owns the data and the imagery?

Ownership and licence terms for the layer and the underlying imagery are settled with a specialist before a project starts. Ask early if counsel needs to review.

How is a project priced?

It depends on the region and the number of quarters. A specialist scopes it with you. There is no price on this page.

Do you cover our market?

Tell us the region. A specialist will say whether imagery for it is available and from which quarter.

Pick a region, see what's new.

Tell us the market and the size of shed you track. We will say what a first quarterly pass would cover.